I-985 Exit Ramp B over Mud Creek
Good Condition7 years old4,330 vehicles/day
Location
| State | Georgia |
| County | Hall |
| Location | 2 Mi S Of Oakwood |
| Carries | I-985 Exit Ramp B |
| Crosses | Mud Creek |
| Coordinates | 34.20092, -83.89434 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 129.9 ft (39.6 m) |
| Max Span | 129.9 ft (39.6 m) |
| Deck Width | 41.3 ft (12.6 m) |
| Deck Area | 499.0 sq m |
| Main Spans | 1 |
| Year Built | 2019 |
Traffic
| Avg Daily Traffic | 4,330 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000013951140 |