CR 824 Jodeco Road over I-75
Good Condition12 years old26,200 vehicles/day
Location
| State | Georgia |
| County | Henry |
| Location | 5 Mi NW Of Mcdonough |
| Carries | CR 824 Jodeco Road |
| Crosses | I-75 |
| Coordinates | 33.48224, -84.21725 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 388.8 ft (118.5 m) |
| Max Span | 123.0 ft (37.5 m) |
| Deck Width | 121.4 ft (37 m) |
| Deck Area | 4384.5 sq m |
| Main Spans | 4 |
| Year Built | 2014 |
Traffic
| Avg Daily Traffic | 26,200 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 8 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000015151180 |