I-75 over SR 7 (us 341)exit136
Fair Condition64 years old67,800 vehicles/day
Location
| State | Georgia |
| County | Houston |
| Location | Perry - NW Section |
| Carries | I-75 |
| Crosses | SR 7 (us 341)exit136 |
| Coordinates | 32.47165, -83.74385 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 220.1 ft (67.1 m) |
| Max Span | 66.9 ft (20.4 m) |
| Deck Width | 139.4 ft (42.5 m) |
| Deck Area | 2851.8 sq m |
| Main Spans | 4 |
| Year Built | 1962 (reconstructed 1993) |
Traffic
| Avg Daily Traffic | 67,800 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000015300520 |