US 80 SR 22 Wb-jr over Ped. Walkway
Good Condition38 years old3,870 vehicles/day
Location
| State | Georgia |
| County | Muscogee |
| Location | Northeast Columbus |
| Carries | US 80 SR 22 Wb-jr |
| Crosses | Ped. Walkway |
| Coordinates | 32.54916, -84.87399 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 144.0 ft (43.9 m) |
| Max Span | 60.0 ft (18.3 m) |
| Deck Width | 41.3 ft (12.6 m) |
| Deck Area | 553.1 sq m |
| Main Spans | 3 |
| Year Built | 1988 |
Traffic
| Avg Daily Traffic | 3,870 (2024) |
| Truck Traffic | 11% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000021501590 |