I-575 (sbl) over CR 85 Fairview Road
Good Condition41 years old76,100 vehicles/day
Location
| State | Georgia |
| County | Pickens |
| Location | Just N Cherokee Co Line |
| Carries | I-575 (sbl) |
| Crosses | CR 85 Fairview Road |
| Coordinates | 34.37653, -84.39296 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 206.0 ft (62.8 m) |
| Max Span | 74.1 ft (22.6 m) |
| Deck Width | 54.1 ft (16.5 m) |
| Deck Area | 1036.2 sq m |
| Main Spans | 3 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 76,100 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000022700340 |