US 27 Bus-sr 1 over Cedar Creek Trib

Good Condition77 years old8,130 vehicles/day

Location

StateGeorgia
CountyPolk
Location0.1 Mi S SR 100 In C-town
CarriesUS 27 Bus-sr 1
CrossesCedar Creek Trib
Coordinates34.00364, -85.25478

Condition Ratings

Overall ConditionGood
Channel/Waterway7 (Good)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length44.9 ft (13.7 m)
Max Span9.8 ft (3 m)
Deck Width61.0 ft (18.6 m)
Deck Area254.8 sq m
Main Spans4
Year Built1949

Traffic

Avg Daily Traffic8,130 (2024)
Truck Traffic1%
Lanes On Bridge3

Inspection & Ownership

Last Inspection124
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000023300030

Nearby Bridges