SR 1 (us 27 Sbl) over SR 6/us 278
Good Condition18 years old4,050 vehicles/day
Location
| State | Georgia |
| County | Polk |
| Location | 4 Miles South Of Cedartow |
| Carries | SR 1 (us 27 Sbl) |
| Crosses | SR 6/us 278 |
| Coordinates | 34.01679, -85.22041 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 231.0 ft (70.4 m) |
| Max Span | 130.9 ft (39.9 m) |
| Deck Width | 42.7 ft (13 m) |
| Deck Area | 915.2 sq m |
| Main Spans | 3 |
| Year Built | 2008 |
Traffic
| Avg Daily Traffic | 4,050 (2024) |
| Truck Traffic | 18% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000023350810 |