US 19 SR 3 Nbl over M-2508 W Poplar Street
Fair Condition58 years old29,500 vehicles/day
Location
| State | Georgia |
| County | Spalding |
| Location | In Griffin |
| Carries | US 19 SR 3 Nbl |
| Crosses | M-2508 W Poplar Street |
| Coordinates | 33.24301, -84.29579 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 115.2 ft (35.1 m) |
| Max Span | 44.9 ft (13.7 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 375.6 sq m |
| Main Spans | 3 |
| Year Built | 1968 |
Traffic
| Avg Daily Traffic | 29,500 (2024) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000025500080 |