I-75 (exit 62) over SR 520 (us 82)
Good Condition69 years old60,400 vehicles/day
Location
| State | Georgia |
| County | Tift |
| Location | App 2 Mi W Of Tifton |
| Carries | I-75 (exit 62) |
| Crosses | SR 520 (us 82) |
| Coordinates | 31.45017, -83.53067 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 160.1 ft (48.8 m) |
| Max Span | 42.0 ft (12.8 m) |
| Deck Width | 152.2 ft (46.4 m) |
| Deck Area | 2264.3 sq m |
| Main Spans | 4 |
| Year Built | 1957 (reconstructed 2005) |
Traffic
| Avg Daily Traffic | 60,400 (2024) |
| Truck Traffic | 1% |
| Lanes On Bridge | 8 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000027700310 |