Southwell BLVD over I-75 (exit 59)

Good Condition39 years old12,300 vehicles/day

Location

StateGeorgia
CountyTift
Location4 Mi S Of Tifton
CarriesSouthwell BLVD
CrossesI-75 (exit 59)
Coordinates31.41605, -83.50518

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length220.1 ft (67.1 m)
Max Span109.9 ft (33.5 m)
Deck Width51.2 ft (15.6 m)
Deck Area1046.8 sq m
Main Spans2
Year Built1987

Traffic

Avg Daily Traffic12,300 (2024)
Truck Traffic1%
Lanes On Bridge2
Lanes Under Bridge6

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000027700700

Nearby Bridges