SR 74 over Swift Creek Trib

Fair Condition78 years old2,370 vehicles/day

Location

StateGeorgia
CountyUpson
Location3 Mi E Of Thomaston
CarriesSR 74
CrossesSwift Creek Trib
Coordinates32.90824, -84.26911

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length22.0 ft (6.7 m)
Max Span9.8 ft (3 m)
Deck Area48.9 sq m
Main Spans2
Year Built1948

Traffic

Avg Daily Traffic2,370 (2024)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last Inspection124
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000029300140

Nearby Bridges