I-75 over SR 3 (us 41)

Good Condition9 years old85,100 vehicles/day

Location

StateGeorgia
CountyWhitfield
LocationIn NW Dalton
CarriesI-75
CrossesSR 3 (us 41)
Coordinates34.79352, -85.00108

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length142.1 ft (43.3 m)
Max Span142.1 ft (43.3 m)
Deck Width181.1 ft (55.2 m)
Deck Area2390.2 sq m
Main Spans1
Year Built2017

Traffic

Avg Daily Traffic85,100 (2024)
Truck Traffic1%
Lanes On Bridge7
Lanes Under Bridge7

Inspection & Ownership

Last Inspection624
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000031350940

Nearby Bridges