IRR BIA RTE 24 over Main Canal
Good Condition57 years old820 vehicles/day
Location
| State | Idaho |
| County | Bingham |
| Location | 4 Km East Of Fort Hall |
| Carries | IRR BIA RTE 24 |
| Crosses | Main Canal |
| Coordinates | 43.02206, -112.38956 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 60.0 ft (18.3 m) |
| Max Span | 58.1 ft (17.7 m) |
| Deck Width | 33.1 ft (10.1 m) |
| Deck Area | 184.8 sq m |
| Main Spans | 1 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 820 (2023) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000P421 |