SH 7 over Clearwater River
Fair Condition28 years old7,800 vehicles/day
Location
| State | Idaho |
| County | Clearwater |
| Location | In Orofino |
| Carries | SH 7 |
| Crosses | Clearwater River |
| Coordinates | 46.47800, -116.25897 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 428.1 ft (130.5 m) |
| Max Span | 149.9 ft (45.7 m) |
| Deck Width | 50.9 ft (15.5 m) |
| Deck Area | 2022.8 sq m |
| Main Spans | 3 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 7,800 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | October 2021 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000010206 |