Yellowstone Trail over I90;yellowstone Trail Gs
Fair Condition35 years old350 vehicles/day
Location
| State | Idaho |
| County | Kootenai |
| Location | 2.5s. 2.5e. Coeur Dalene |
| Carries | Yellowstone Trail |
| Crosses | I90;yellowstone Trail Gs |
| Coordinates | 47.63214, -116.70594 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 270.0 ft (82.3 m) |
| Max Span | 149.9 ft (45.7 m) |
| Deck Width | 34.1 ft (10.4 m) |
| Deck Area | 855.9 sq m |
| Main Spans | 2 |
| Year Built | 1991 |
Traffic
| Avg Daily Traffic | 350 (2023) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 321 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000016898 |