SH 75 over Salmon River
Fair Condition49 years old1,000 vehicles/day
Location
| State | Idaho |
| County | Blaine |
| Location | 1.5 SE Sawtooth City |
| Carries | SH 75 |
| Crosses | Salmon River |
| Coordinates | 43.88411, -114.76394 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 8 (Very Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 44.9 ft (13.7 m) |
| Max Span | 44.0 ft (13.4 m) |
| Deck Width | 41.3 ft (12.6 m) |
| Deck Area | 172.6 sq m |
| Main Spans | 1 |
| Year Built | 1977 |
Traffic
| Avg Daily Traffic | 1,000 (2023) |
| Truck Traffic | 11% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000017710 |