SH 75 over Salmon River; W. Clayton

Good Condition18 years old680 vehicles/day

Location

StateIdaho
CountyCuster
Location2 W. Clayton
CarriesSH 75
CrossesSalmon River; W. Clayton
Coordinates44.25950, -114.44072

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure8 (Very Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length297.9 ft (90.8 m)
Max Span118.1 ft (36 m)
Deck Width41.3 ft (12.6 m)
Deck Area1144.1 sq m
Main Spans3
Year Built2008

Traffic

Avg Daily Traffic680 (2023)
Truck Traffic15%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number000000000017791

Nearby Bridges