SH 75 over Salmon River;e. Clayton

Good Condition12 years old600 vehicles/day

Location

StateIdaho
CountyCuster
Location5 E. Clayton
CarriesSH 75
CrossesSalmon River;e. Clayton
Coordinates44.26581, -114.32714

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure7 (Good)
Substructure8 (Very Good)
Channel/Waterway9 (Excellent)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length263.1 ft (80.2 m)
Max Span118.1 ft (36 m)
Deck Width43.6 ft (13.3 m)
Deck Area1066.7 sq m
Main Spans3
Year Built2014

Traffic

Avg Daily Traffic600 (2023)
Truck Traffic18%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number000000000017796

Nearby Bridges