Stc2745;3700 North over Twin Falls Main Canal
Fair Condition55 years old920 vehicles/day
Location
| State | Idaho |
| County | Twin Falls |
| Location | 2.8 N. 1.5 W. Murtaugh |
| Carries | Stc2745;3700 North |
| Crosses | Twin Falls Main Canal |
| Coordinates | 42.53308, -114.19803 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 204.1 ft (62.2 m) |
| Max Span | 77.1 ft (23.5 m) |
| Deck Width | 31.8 ft (9.7 m) |
| Deck Area | 603.3 sq m |
| Main Spans | 3 |
| Year Built | 1971 |
Traffic
| Avg Daily Traffic | 920 (2023) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000019480 |