Center Street over Portneuf River
Fair Condition58 years old2,850 vehicles/day
Location
| State | Idaho |
| County | Bannock |
| Location | In Pocatello;center ST |
| Carries | Center Street |
| Crosses | Portneuf River |
| Coordinates | 42.85936, -112.45500 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 45.9 ft (14 m) |
| Max Span | 43.0 ft (13.1 m) |
| Deck Width | 53.8 ft (16.4 m) |
| Deck Area | 229.6 sq m |
| Main Spans | 1 |
| Year Built | 1968 |
Traffic
| Avg Daily Traffic | 2,850 (2023) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000022180 |