2200 East Road over T.f.northside Main Cnl
Fair Condition57 years old310 vehicles/day
Location
| State | Idaho |
| County | Jerome |
| Location | 0.3 S. 3.0 E. Hazelton |
| Carries | 2200 East Road |
| Crosses | T.f.northside Main Cnl |
| Coordinates | 42.59103, -114.07781 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 5 (Fair) |
| Scour Critical | Unknown |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 82.0 ft (25 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 24.0 ft (7.3 m) |
| Deck Area | 182.5 sq m |
| Main Spans | 2 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 310 (2023) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000000024755 |