175th E./poplar RD over Anderson Canal

Fair Condition55 years old160 vehicles/day

Location

StateIdaho
CountyBonneville
Location0.3 S. 4.5 E. Ririe
Carries175th E./poplar RD
CrossesAnderson Canal
Coordinates43.62153, -111.68578

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure5 (Fair)
Channel/Waterway5 (Fair)
Scour Critical4 — Foundations need monitoring

Physical Characteristics

MaterialPrestressed Concrete
DesignTee Beam
Total Length39.0 ft (11.9 m)
Max Span37.1 ft (11.3 m)
Deck Width30.2 ft (9.2 m)
Deck Area109.5 sq m
Main Spans1
Year Built1971

Traffic

Avg Daily Traffic160 (2023)
Truck Traffic7%
Lanes On Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number000000000031130

Nearby Bridges