N 2100 E over St. Anthony Canal

Fair Condition65 years old150 vehicles/day

Location

StateIdaho
CountyFremont
Location1.1 N. 1.0 E. Parker
CarriesN 2100 E
CrossesSt. Anthony Canal
Coordinates43.97408, -111.73789

Condition Ratings

Overall ConditionFair
Deck8 (Very Good)
Superstructure6 (Satisfactory)
Substructure5 (Fair)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignTee Beam
Total Length30.8 ft (9.4 m)
Max Span29.9 ft (9.1 m)
Deck Width23.0 ft (7 m)
Deck Area65.8 sq m
Main Spans1
Year Built1961

Traffic

Avg Daily Traffic150 (2023)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceHistorical significance is not determined
Structure Number000000000032035

Nearby Bridges