Il 96 over White Oak Creek
Fair Condition32 years old2,300 vehicles/day
Location
| State | Illinois |
| County | Adams |
| Location | 1.6m S Ch 41 In Lima |
| Carries | Il 96 |
| Crosses | White Oak Creek |
| Coordinates | 40.15345, -91.37523 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 78.4 ft (23.9 m) |
| Max Span | 73.5 ft (22.4 m) |
| Deck Width | 35.1 ft (10.7 m) |
| Deck Area | 255.7 sq m |
| Main Spans | 1 |
| Year Built | 1994 |
Traffic
| Avg Daily Traffic | 2,300 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 001007400000000 |