Fas 591 Ch-5 over Tournear Creek
Good Condition17 years old425 vehicles/day
Location
| State | Illinois |
| County | Adams |
| Location | 2 M SE Burton |
| Carries | Fas 591 Ch-5 |
| Crosses | Tournear Creek |
| Coordinates | 39.88932, -91.21697 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 121.4 ft (37 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 314.5 sq m |
| Main Spans | 3 |
| Year Built | 2009 |
Traffic
| Avg Daily Traffic | 425 (2024) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 48 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 001333700000000 |