I-74(WB) over Saline Drain Ditch
Good Condition67 years old14,150 vehicles/day
Location
| State | Illinois |
| County | Champaign |
| Location | 1.5 Mi W ST Joseph |
| Carries | I-74(WB) |
| Crosses | Saline Drain Ditch |
| Coordinates | 40.12049, -88.07044 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 165.0 ft (50.3 m) |
| Max Span | 60.0 ft (18.3 m) |
| Deck Width | 42.3 ft (12.9 m) |
| Deck Area | 648.9 sq m |
| Main Spans | 3 |
| Year Built | 1959 (reconstructed 1993) |
Traffic
| Avg Daily Traffic | 14,150 (2023) |
| Truck Traffic | 30% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 010002700000000 |