Mattis Ave(fau 715 over Phinney Branch
Fair Condition49 years old5,500 vehicles/day
Location
| State | Illinois |
| County | Champaign |
| Location | 0.75 Mi S Kirby AVE |
| Carries | Mattis Ave(fau 715 |
| Crosses | Phinney Branch |
| Coordinates | 40.08731, -88.27636 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 65.0 ft (19.8 m) |
| Max Span | 24.9 ft (7.6 m) |
| Deck Width | 78.1 ft (23.8 m) |
| Deck Area | 471.2 sq m |
| Main Spans | 3 |
| Year Built | 1977 |
Traffic
| Avg Daily Traffic | 5,500 (2021) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 010620200000000 |