Fap 328 (us 45) over Seminary Ck Overflow

Good Condition17 years old2,250 vehicles/day

Location

StateIllinois
CountyClay
Location4 Mi S Jct US 50
CarriesFap 328 (us 45)
CrossesSeminary Ck Overflow
Coordinates38.61723, -88.43826

Condition Ratings

Overall ConditionGood
Channel/Waterway8 (Very Good)
Culvert8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length24.0 ft (7.3 m)
Max Span11.8 ft (3.6 m)
Deck Area89.1 sq m
Main Spans2
Year Built2009

Traffic

Avg Daily Traffic2,250 (2023)
Truck Traffic16%
Lanes On Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number013201100000000

Nearby Bridges