Fap 328 (us 45) over Seminary Ck Overflow
Good Condition17 years old2,250 vehicles/day
Location
| State | Illinois |
| County | Clay |
| Location | 4 Mi S Jct US 50 |
| Carries | Fap 328 (us 45) |
| Crosses | Seminary Ck Overflow |
| Coordinates | 38.61723, -88.43826 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 24.0 ft (7.3 m) |
| Max Span | 11.8 ft (3.6 m) |
| Deck Area | 89.1 sq m |
| Main Spans | 2 |
| Year Built | 2009 |
Traffic
| Avg Daily Traffic | 2,250 (2023) |
| Truck Traffic | 16% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 013201100000000 |