I- 55 EB Stevenson over Il 50 (cicero Ave)

Poor Condition63 years old68,750 vehicles/day

Location

StateIllinois
CountyCook
Location5.7 M SW I94
CarriesI- 55 EB Stevenson
CrossesIl 50 (cicero Ave)
Coordinates41.81696, -87.74392

Condition Ratings

Overall ConditionPoor
Deck6 (Satisfactory)
Superstructure5 (Fair)
Substructure4 (Poor)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length206.7 ft (63 m)
Max Span115.2 ft (35.1 m)
Deck Width59.4 ft (18.1 m)
Deck Area1140.3 sq m
Main Spans3
Year Built1963 (reconstructed 2000)

Traffic

Avg Daily Traffic68,750 (2024)
Truck Traffic9%
Lanes On Bridge3
Lanes Under Bridge7

Inspection & Ownership

Last InspectionDecember 2024
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number016001600000000

Nearby Bridges