I- 55 WB Stevenson over California AVE
Good Condition63 years old78,300 vehicles/day
Location
| State | Illinois |
| County | Cook |
| Location | 3 M SW Dan Ryan |
| Carries | I- 55 WB Stevenson |
| Crosses | California AVE |
| Coordinates | 41.83218, -87.69489 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 190.9 ft (58.2 m) |
| Max Span | 100.4 ft (30.6 m) |
| Deck Width | 70.2 ft (21.4 m) |
| Deck Area | 1245.5 sq m |
| Main Spans | 3 |
| Year Built | 1963 (reconstructed 2000) |
Traffic
| Avg Daily Traffic | 78,300 (2024) |
| Truck Traffic | 8% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 016002500000000 |