I- 90 94 Jfk over Webster AVE

Fair Condition67 years old222,500 vehicles/day

Location

StateIllinois
CountyCook
Location0.9 M NW Il 64
CarriesI- 90 94 Jfk
CrossesWebster AVE
Coordinates41.92153, -87.67707

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length236.2 ft (72 m)
Max Span92.8 ft (28.3 m)
Deck Width207.3 ft (63.2 m)
Deck Area4550.4 sq m
Main Spans3
Year Built1959 (reconstructed 1994)

Traffic

Avg Daily Traffic222,500 (2024)
Truck Traffic6%
Lanes On Bridge10
Lanes Under Bridge4

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number016013100000000

Nearby Bridges