Willow Springs RD over I-294 Tri State Toll

Fair Condition68 years old14,700 vehicles/day

Location

StateIllinois
CountyCook
Location0.2 M S I-55
CarriesWillow Springs RD
CrossesI-294 Tri State Toll
Coordinates41.75882, -87.88686

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length316.6 ft (96.5 m)
Max Span120.4 ft (36.7 m)
Deck Width69.9 ft (21.3 m)
Deck Area2055.4 sq m
Main Spans2
Year Built1958 (reconstructed 1992)

Traffic

Avg Daily Traffic14,700 (2023)
Truck Traffic3%
Lanes On Bridge2
Lanes Under Bridge5

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number016053800000000

Nearby Bridges