I- 55 EB To I90 94 over Chi River; Cermak;rr

Fair Condition64 years old32,300 vehicles/day

Location

StateIllinois
CountyCook
Location1.4 M SW I-290
CarriesI- 55 EB To I90 94
CrossesChi River; Cermak;rr
Coordinates41.84999, -87.64426

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Channel/Waterway8 (Very Good)
Scour Critical9 — Foundation above flood level

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length517.1 ft (157.6 m)
Max Span220.1 ft (67.1 m)
Deck Width32.8 ft (10 m)
Deck Area1,576 sq m
Main Spans3
Year Built1962 (reconstructed 1994)

Traffic

Avg Daily Traffic32,300 (2024)
Truck Traffic8%
Lanes On Bridge2
Lanes Under Bridge5

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number016107000000000

Nearby Bridges