Fau-2537 Bartlett over Poplar Creek
Fair Condition90 years old11,600 vehicles/day
Location
| State | Illinois |
| County | Cook |
| Location | 0.4 M N Bode RD P7 |
| Carries | Fau-2537 Bartlett |
| Crosses | Poplar Creek |
| Coordinates | 42.04475, -88.17904 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete |
| Design | Tee Beam |
| Total Length | 43.0 ft (13.1 m) |
| Max Span | 41.3 ft (12.6 m) |
| Deck Width | 98.1 ft (29.9 m) |
| Deck Area | 391.7 sq m |
| Main Spans | 1 |
| Year Built | 1936 (reconstructed 1981) |
Traffic
| Avg Daily Traffic | 11,600 (2022) |
| Truck Traffic | 3% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 016301000000000 |