Fullerton Parkway over Lincoln Pk Lagoon
Fair Condition14 years old21,300 vehicles/day
Location
| State | Illinois |
| County | Cook |
| Location | 2400 N. & 100 E. |
| Carries | Fullerton Parkway |
| Crosses | Lincoln Pk Lagoon |
| Coordinates | 41.92592, -87.63236 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 123.4 ft (37.6 m) |
| Max Span | 117.5 ft (35.8 m) |
| Deck Width | 84.6 ft (25.8 m) |
| Deck Area | 970.1 sq m |
| Main Spans | 1 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 21,300 (2022) |
| Truck Traffic | 4% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 016627300000000 |