Mdwy Upper Lev RD over Arrival Exit Road
Good Condition28 years old4,450 vehicles/day
Location
| State | Illinois |
| County | Cook |
| Location | Ele Ramp To NB Cicer |
| Carries | Mdwy Upper Lev RD |
| Crosses | Arrival Exit Road |
| Coordinates | 41.78953, -87.74104 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 461.9 ft (140.8 m) |
| Max Span | 93.2 ft (28.4 m) |
| Deck Width | 27.2 ft (8.3 m) |
| Deck Area | 1168.6 sq m |
| Main Spans | 7 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 4,450 (2022) |
| Truck Traffic | 12% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 016660600000000 |