Fai-70 over Big Creek
Fair Condition64 years old23,900 vehicles/day
Location
| State | Illinois |
| County | Effingham |
| Location | 1.6 Mi E Fayette C L |
| Carries | Fai-70 |
| Crosses | Big Creek |
| Coordinates | 39.03504, -88.77875 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 28.9 ft (8.8 m) |
| Max Span | 9.8 ft (3 m) |
| Deck Area | 214.7 sq m |
| Main Spans | 3 |
| Year Built | 1962 |
Traffic
| Avg Daily Traffic | 23,900 (2023) |
| Truck Traffic | 47% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 025200000000000 |