Fas-711 (ch-25) over Moccasin Creek
Fair Condition63 years old850 vehicles/day
Location
| State | Illinois |
| County | Effingham |
| Location | 4 Mi N Altamont |
| Carries | Fas-711 (ch-25) |
| Crosses | Moccasin Creek |
| Coordinates | 39.12630, -88.74791 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Channel Beam |
| Total Length | 80.1 ft (24.4 m) |
| Max Span | 26.9 ft (8.2 m) |
| Deck Width | 25.9 ft (7.9 m) |
| Deck Area | 192.8 sq m |
| Main Spans | 3 |
| Year Built | 1963 |
Traffic
| Avg Daily Traffic | 850 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 025301000000000 |