US 411 New Align over Branch
Good Condition3 years old8,848 vehicles/day
Location
| State | Alabama |
| County | Etowah |
| Location | 0.3mi N Owls Hollow RD |
| Carries | US 411 New Align |
| Crosses | Branch |
| Coordinates | 34.13479, -85.99816 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 9.8 ft (3 m) |
| Deck Area | 155.6 sq m |
| Main Spans | 3 |
| Year Built | 2023 |
Traffic
| Avg Daily Traffic | 8,848 (2022) |
| Truck Traffic | 14% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 016877 |