Blue Spruce Ln-tr9 over Mid. Br Copperas CR
Fair Condition44 years old25 vehicles/day
Location
| State | Illinois |
| County | Fulton |
| Location | N.line-se-36-t8nr4e |
| Carries | Blue Spruce Ln-tr9 |
| Crosses | Mid. Br Copperas CR |
| Coordinates | 40.63300, -89.99357 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 118.1 ft (36 m) |
| Max Span | 39.0 ft (11.9 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 306 sq m |
| Main Spans | 3 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 25 (2020) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | Town/Township Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 029406000000000 |