Ch 2 / Fas 224 over Big Slough Ditch

Good Condition36 years old1,200 vehicles/day

Location

StateIllinois
CountyHenry
Location3 Mi. NE Geneseo
CarriesCh 2 / Fas 224
CrossesBig Slough Ditch
Coordinates41.49250, -90.13338

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure8 (Very Good)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length56.8 ft (17.3 m)
Max Span54.1 ft (16.5 m)
Deck Width36.1 ft (11 m)
Deck Area190.3 sq m
Main Spans1
Year Built1990

Traffic

Avg Daily Traffic1,200 (2020)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 48 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number037331200000000

Nearby Bridges