I-74 over Drainage Ditch
Fair Condition57 years old21,600 vehicles/day
Location
| State | Illinois |
| County | McLean |
| Location | 10.39 M E Of Bs51 |
| Carries | I-74 |
| Crosses | Drainage Ditch |
| Coordinates | 40.36463, -88.82093 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 7 (Good) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 24.9 ft (7.6 m) |
| Max Span | 12.1 ft (3.7 m) |
| Deck Area | 185.4 sq m |
| Main Spans | 2 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 21,600 (2023) |
| Truck Traffic | 35% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 057203300000000 |