Fau-7411 over Big Creek
Good Condition9 years old625 vehicles/day
Location
| State | Illinois |
| County | Macon |
| Location | S Fort Daniels Area |
| Carries | Fau-7411 |
| Crosses | Big Creek |
| Coordinates | 39.76292, -88.82524 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 85.6 ft (26.1 m) |
| Max Span | 81.7 ft (24.9 m) |
| Deck Width | 41.3 ft (12.6 m) |
| Deck Area | 328.9 sq m |
| Main Spans | 1 |
| Year Built | 2017 |
Traffic
| Avg Daily Traffic | 625 (2021) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 48 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 058339900000000 |