Fai 55/70 EB over Canteen Creek
Fair Condition66 years old26,800 vehicles/day
Location
| State | Illinois |
| County | Madison |
| Location | Fai 70 Over Canteen |
| Carries | Fai 55/70 EB |
| Crosses | Canteen Creek |
| Coordinates | 38.66522, -90.05659 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 288.1 ft (87.8 m) |
| Max Span | 107.9 ft (32.9 m) |
| Deck Width | 59.1 ft (18 m) |
| Deck Area | 1580.4 sq m |
| Main Spans | 3 |
| Year Built | 1960 (reconstructed 1991) |
Traffic
| Avg Daily Traffic | 26,800 (2023) |
| Truck Traffic | 19% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 060001000000000 |