New Douglas RD over Silver Creek

Poor Condition35 years old1,400 vehicles/day

Location

StateIllinois
CountyMadison
Location1.7 Mi E. I-55
CarriesNew Douglas RD
CrossesSilver Creek
Coordinates38.96842, -89.72066

Condition Ratings

Overall ConditionPoor
Deck4 (Poor)
Superstructure4 (Poor)
Substructure5 (Fair)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length126.3 ft (38.5 m)
Max Span56.1 ft (17.1 m)
Deck Width27.9 ft (8.5 m)
Deck Area327.2 sq m
Main Spans3
Year Built1991

Traffic

Avg Daily Traffic1,400 (2021)
Truck Traffic6%
Lanes On Bridge2

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number060025700000000

Nearby Bridges