Fau 8877/new Poag over Icg & Conrail Rr

Good Condition38 years old5,500 vehicles/day

Location

StateIllinois
CountyMadison
Location1 Mi. S. Harford
CarriesFau 8877/new Poag
CrossesIcg & Conrail Rr
Coordinates38.79839, -90.08542

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure8 (Very Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length254.9 ft (77.7 m)
Max Span100.1 ft (30.5 m)
Deck Width43.3 ft (13.2 m)
Deck Area1025.6 sq m
Main Spans3
Year Built1988

Traffic

Avg Daily Traffic5,500 (2021)
Truck Traffic14%
Lanes On Bridge2

Inspection & Ownership

Last Inspection124
Inspection FrequencyEvery 48 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number060328000000000