Il 161 - Fap 805 over Raccoon Creek

Fair Condition52 years old5,150 vehicles/day

Location

StateIllinois
CountyMarion
Location3 Mi E Centralia
CarriesIl 161 - Fap 805
CrossesRaccoon Creek
Coordinates38.52497, -89.05806

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length172.9 ft (52.7 m)
Max Span63.0 ft (19.2 m)
Deck Width45.9 ft (14 m)
Deck Area737.8 sq m
Main Spans3
Year Built1974

Traffic

Avg Daily Traffic5,150 (2023)
Truck Traffic6%
Lanes On Bridge2

Inspection & Ownership

Last Inspection423
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number061007100000000

Nearby Bridges