Progress St(ms 260 over Lowe Ditch #2
Fair Condition32 years old1,400 vehicles/day
Location
| State | Illinois |
| County | Moultrie |
| Location | W Edge Of Arthur |
| Carries | Progress St(ms 260 |
| Crosses | Lowe Ditch #2 |
| Coordinates | 39.71689, -88.48061 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 53.1 ft (16.2 m) |
| Max Span | 51.8 ft (15.8 m) |
| Deck Width | 47.9 ft (14.6 m) |
| Deck Area | 236.5 sq m |
| Main Spans | 1 |
| Year Built | 1994 |
Traffic
| Avg Daily Traffic | 1,400 (2020) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 070600300000000 |