Fap 671 Spur WB over I-474
Fair Condition48 years old4,300 vehicles/day
Location
| State | Illinois |
| County | Peoria |
| Location | 0.5m North Bellevue |
| Carries | Fap 671 Spur WB |
| Crosses | I-474 |
| Coordinates | 40.69387, -89.67636 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 266.1 ft (81.1 m) |
| Max Span | 98.1 ft (29.9 m) |
| Deck Width | 57.1 ft (17.4 m) |
| Deck Area | 1411.1 sq m |
| Main Spans | 2 |
| Year Built | 1978 (reconstructed 2013) |
Traffic
| Avg Daily Traffic | 4,300 (2022) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 072012000000000 |