NB Ill 6 over Charter Oak Road
Fair Condition48 years old28,400 vehicles/day
Location
| State | Illinois |
| County | Peoria |
| Location | 1 Mi N Of I-74 |
| Carries | NB Ill 6 |
| Crosses | Charter Oak Road |
| Coordinates | 40.75466, -89.67136 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 138.1 ft (42.1 m) |
| Max Span | 63.0 ft (19.2 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 534.7 sq m |
| Main Spans | 3 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 28,400 (2023) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 072013800000000 |